Benchwork Done!

At 2208h today, Sunday, 17 Aug 2014, benchwork for the two track levels is officially complete.  Woo hoo!  The only major benchwork yet to go is the upper lighting valance deck over Chitina.  Right now it ends above the third Copper crossing.  Unfortunately, I have a great deal to do for my day job this week, so I’m not anticipating finishing that up.  However, next weekend is largely open, so I should be able to start on the helix and getting the first track down.

I’m not posting any pictures right now because – due to construction and moving things out of the way – my basement looks like the apocalypse struck.  Once I get things tidied back up, I’ll post pictures.