Smells Like Progress

While not feeling the greatest this weekend, I resigned myself to the basement and building benchwork.  As a result, the gridwork is now in place for Cordova-Eyak on the bottom level and McCarthy-Gilahina-Chokosna on the upper level.

Included in the upper level is the first major piece of depressed grid that will accomodate one of the four big bridges I plan to model  – the Gilahina Trestle.  (Photo linked from Don Bains’ Virtual Guidebooks site.)  The other three big bridges being the Miles Glacier / Million Dollar Bridge, the third Copper River crossing, and the Kuskulana Bridge.)  The current version is actually the second trestle – the original burned in 1916 and was replaced by the one we have today.  The structure is ~880 feet long and ~90 feet high on a ~15 degree curve (radius ~440ft.), with six piles per bent and extensive cross-bracing.  Today, it survives alongside the McCarthy Road in a deteriorated state.

For my proto-freelanced version of the CRNW, though, there’s simply no plausible way the trestle would have survived in service to present day.  A 100 year old high wooden trestle is just not up to the passage of heavy ore trains and 200-ton locomotives multiple times per day, no matter how well built or well maintained it may be.  Plus, the trestle forms most of a very sharp curve – much sharper than any reasonable mainline standard.  However, it’s such a stunning visual element along the line, and one that many people who have visited the area are familiar with, so I also can’t leave it out.  My solution is that the mainline will pass by in the foreground, atop a modern deck girder bridge constructed as part of a 1960s-70s era line change (exact date in alternate history to be determined), while the old abandoned trestle remains in the background.  Like many things in the wilderness of the far north, the old is often left just because it’s not economical to tear it down.  Plus, in this case its historical significance to the area in addition to its site within the the Wrangell-St. Elias National Preserve would lend to its preservation.

I’ve had to scale the Gilahina Trestle just a bit.  While 880′ in length, it’s only about 650′ on a straight line between the ends due to the sharp curvature.  (Distances estimated from aerial photographs.)  At full size, it would be approximately 4′ long and 6.75″ high in N scale.  I plan to keep it full height – hence the drop section to give me an extra 3.25″ to play with, but compress the length to about 3′, or 480′ in full size.

If anybody has measurements or plans for the Gilahina Trestle, I’d greatly appreciate hearing from you.  Otherwise I’ll have to head back north and spend some quality time with just me, the trestle, a tape measure, and an ultrasonic range finder.

Here’s a couple shots of the new benchwork grid, including the drop section for accomo

benchwork-eastwallbenchwork-eastwall2

In addition, the Fast Tracks jig finally arrived, and I’ve been practicing at building turnouts.  So far, I’ve built two – one right and one left – and I don’t think I’ve quite gotten the hang of it yet.  Both are usable, but not quite as perfect as I’d like – particularly in the area of getting the point rails just right and making the throwbar move flawlessly.  (I seem to always get the point rails stuck on the stock rail when soldering them, and can never get it deburred once I separate them.)  Also, the FT#7 is a bit bigger than the Atlas #7, leading me to believe the Atlas #7 is really more of a #5-#6.  I’ve put my second attempt next to an Atlas unit so you can do a size comparison.

fasttracks first-scratchbuilt-turnout

Until next time…